Submitted by Visitor (not verified) on July 18, 2007 - 1:11pm.
One day the Triangle Parkway will interchange with 540. Obviously, there was not enough room at Davis Dr. to plan for that future connection.
As for the section of two lane to the north that did not get widened on NC54. Developers are planning large retail/commercial expansion just north of the 540/NC54 interchange. Additional widening will be done along NC54, including the existing 2 lane section.......AT NO COST TO THE CITIZENS OF NC!
interchange at Davis Dr
One day the Triangle Parkway will interchange with 540. Obviously, there was not enough room at Davis Dr. to plan for that future connection.
As for the section of two lane to the north that did not get widened on NC54. Developers are planning large retail/commercial expansion just north of the 540/NC54 interchange. Additional widening will be done along NC54, including the existing 2 lane section.......AT NO COST TO THE CITIZENS OF NC!